Bridge Between Piers 4 and 5
Engineer / Architect: |
N/A |
Location: |
Between Piers 4 and 5
Baltimore, MD
|
Year Built: |
N/A |
Structural Form: |
Cable-stayed Girder Bridge |
Historical Details: |
N/A |
Technical Details: |
The majority of the forces in this bridge seem to be carried by the steel girder underneath the deck. The cable-stayed portion seems to only stiffen the deck and provides no clear load path to either pier. |
Image Source(s): |
Matt Sisinni |
References: |
N/A |